Craftsman: What to consider when placing an order
A clogged pipe, a defective washing machine or a car that no longer drives: in such cases, quick help from a specialist handyman in my area in Commerce Township, MI required. But not everything goes to the satisfaction of the customer with every repair. Problems can also arise with work by painters, tilers, electricians and the like: What should be done if deadlines are not met, costs are exceeded or the work has been poorly carried out are to known so these tips will help avoid trouble:
Before the job
The order should be placed as precisely as possible :
- Establish binding rules, preferably in writing, of the scope
- the execution date and
- the remuneration.
- When making arrangements on site, make sure that your own witness is present.
Get multiple estimates :
- These should contain the services and required materials in as much detail as possible.
- You can compare the conditions of several companies with one another based on the hourly rates and material prices.
- A fee for the cost estimate may craftsmen only demand or customer services if this has been expressly agreed in advance.
While working
If it turns out that the estimated costs are significantly higher , the craftsman must notify this immediately:
- The limit is an increase of more than 15 to 20 percent compared to the estimated costs.
- The client can then terminate the contract for work, but must pay for the agreed partial services that have already been performed.
- If you want to avoid this, you should agree on a fixed price. This must not be exceeded.
If tradesmen do not meet a fixed deadline , they are in default:
- Therefore keep an eye on the progress of the work.
- Set a deadline for delays. One to two weeks are usually appropriate.
- You are entitled to compensation for the damage incurred if the delay is due to the lax attitude of the craftsman.
- However, if the craftsman cannot start work due to serious illness or if there is a delay because the necessary preparatory work by other specialists has not been carried out, the client is unlucky.
- You can save yourself trouble here if you agree a written contractual penalty with the craft business for such cases, which is due if the deadline is missed.